The fastest steelwork contractor in the Netherlands
Production capacity of 25,000 tonnes a year
Partner for data centres, defence & distribution
Family-owned since 1974
Home/
Plus Ultra Utrecht
Utiliteitsbouw
2023
Goossen Te Pas Bouw
Utrecht

Plus Ultra Utrecht

Goossen Te Pas Bouw
Plus Ultra Utrecht
Location
Utrecht
Tonnage
1,350
Type
Utiliteitsbouw
Completion
2023
About this project

The project in detail.

1,350 tonnes of steel for Plus Ultra Utrecht

For Plus Ultra Utrecht, a modern laboratory and office building at Utrecht Science Park, Hutten Metaal Staalbouw delivered the complete steel structure. The building covers approximately 23,000 m² and houses laboratories, offices and shared facilities.

Our scope

What we delivered

1,350 tonnes of steel

A technically challenging project at a special location, to which Hutten Metaal made a key contribution with the complete steel structure.

Approach

From engineering to assembly on site.

Phase 01

Engineering

Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.

Phase 02

Fabrication

Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.

Phase 03

Surface protection

Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.

Phase 04

Assembly

Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.

“
A multi-tenant building with laboratories demands precision and flexibility. We deliver that steel from the drawing board to the last bolt.
Project leader · Hutten metaal Staalbouw

A similar project?

Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.