On Maasvlakte II in Rotterdam, Maersk realised a new building of approximately 23,000 m². A substantial logistics centre in a strategic location, directly next to the container terminal.
The distribution centre has no fewer than 120 docks and is designed to quickly tranship goods arriving by ship and transport them onwards to the European hinterland.
For this impressive project, we fabricated the steel structure.
Fabrication of approximately 1,200 tonnes of steel for Maersk's new cross-dock centre on Maasvlakte II.
Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.
Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.
Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.
Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.
Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.