Commissioned by Cordeel Nederland, Hutten Metaal Staalbouw handled the fabrication and assembly of more than 1,350 tonnes of steel for the expansion of Lamb Weston's production facility in Kruiningen.
With a production hall of approximately 20,000 m² and an integrated three-storey office, the new factory is a major expansion of the existing site.
The factory increases annual production capacity by no less than 195 million kilograms of potato products and is designed for an efficient, largely automated production process.
A production facility of this size requires a robust and reliable steel structure. The combination of large-scale production processes, technical installations and different building functions places high demands on both design and execution.
By fabricating and assembling more than 1,350 tonnes of steel, Hutten Metaal Staalbouw made a key contribution to the realisation of this modern factory.
Sustainability and efficiency played an important role in the design. The factory was developed with a focus on energy-efficient production, water reuse and heat recovery.
A future-proof production site, supported by a solid steel structure.
Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.
Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.
Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.
Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.
Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.