On a prominent site next to the railway and the Eemplein, the new Huis voor de Stad Amersfoort is rising. A sustainable, future-proof city hall that from 2027 will become a central place for residents, employees and organisations in the city.
The design consists of two interlocking building sections, with an impressive atrium at the heart of the building. The high-rise section has six storeys and is combined with a lower section of four storeys.
We fabricated and supplied the steel structure for this remarkable project.
A project in which scale, structural challenges and precise coordination come together. The different building sections are connected by, among other things, large steel structures.
Commissioned by Dura Vermeer Bouw Hengelo, we put our knowledge and experience in steel construction to work to help realise this landmark project.
800 tonnes of steel.
A fine example of what we at Hutten Metaal love to work on: complex steel structures for projects that deserve to be seen.
Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.
Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.
Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.
Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.