About this project

The project in detail.

2,400 tonnes of steel for impressive new-build halls

At the Koggehaven in Vlaardingen, we realised the steel structure for a substantial new-build project.

For the new halls, we fabricated and assembled approximately 2,400 tonnes of steel. We also laid approximately 8,000 m² of hollow-core slab floors and installed precast concrete cores, stairs and landings.

A project of this size demands tight preparation, precise fabrication and close coordination during assembly. Especially where steel construction, precast concrete and floor systems come together, every component has to connect at the right moment and in the right place.

Our scope

What we delivered

New-build hall, including laying ±8,000 m² of hollow-core slab floors and installing precast concrete cores, stairs and landings.

‍

Approach

From engineering to assembly on site.

Phase 01

Engineering

Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.

Phase 02

Fabrication

Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.

Phase 03

Surface protection

Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.

Phase 04

Assembly

Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.

“
2,400 tonnes of steel to Vlaardingen

A similar project?

Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.