At the Koggehaven in Vlaardingen, we realised the steel structure for a substantial new-build project.
For the new halls, we fabricated and assembled approximately 2,400 tonnes of steel. We also laid approximately 8,000 m² of hollow-core slab floors and installed precast concrete cores, stairs and landings.
A project of this size demands tight preparation, precise fabrication and close coordination during assembly. Especially where steel construction, precast concrete and floor systems come together, every component has to connect at the right moment and in the right place.
New-build hall, including laying ±8,000 m² of hollow-core slab floors and installing precast concrete cores, stairs and landings.
Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.
Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.
Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.
Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.
Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.