Dc Doornhoek Ede
Distributiecentrum
2020
Bouwbedrijf van de Ven
Ede

Dc Doornhoek Ede

Bouwbedrijf van de Ven
Dc Doornhoek Ede
Location
Ede
Tonnage
580
Type
Distributiecentrum
Completion
2020
About this project

The project in detail.

Deze opdracht laat zien hoe een gedeelde passie voor sport ook zakelijk tot mooie samenwerkingen kan leiden.

‍

Our scope

What we delivered

Approach

From engineering to assembly on site.

Phase 01

Engineering

Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.

Phase 02

Fabrication

Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.

Phase 03

Surface protection

Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.

Phase 04

Assembly

Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.

“

A similar project?

Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.