Rotterdam Ahoy – Hart van Zuid
Utiliteitsbouw
2021
Hart van Zuid v.o.f.
Rotterdam

Rotterdam Ahoy – Hart van Zuid

Hart van Zuid v.o.f.
Rotterdam Ahoy – Hart van Zuid
Location
Rotterdam
Tonnage
3,200
Type
Utiliteitsbouw
Completion
2021
About this project

The project in detail.

3,200 tonnes of steel for Rotterdam Ahoy – Hart van Zuid

For the expansion of Rotterdam Ahoy, part of the Hart van Zuid area development, Hutten Metaal Staalbouw supplied and assembled approximately 3,200 tonnes of steel. The complex steel structure for the conference centre and the concert hall was executed to execution class EXC3, in line with the high demands placed on a complex and intensively used building such as Ahoy.

One of the most striking parts of the structure is the large steel trusses. With a length of no less than 51.5 metres, a height of 6.5 metres and a weight of approximately 35 tonnes each, these elements required meticulous preparation, fabrication and assembly.

Hutten Metaal Staalbouw was also involved in several other projects within Hart van Zuid. We supplied approximately 650 tonnes of steel for the new Kunstenpand arts building and previously contributed to the swimming pool in the former district council office.

Hart van Zuid is therefore a fine example of the breadth of our steel construction: from heavy main load-bearing structures and large spans to complete steel solutions for large-scale non-residential construction.

Our scope

What we delivered

3,200 tonnes of steel

Approach

From engineering to assembly on site.

Phase 01

Engineering

Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.

Phase 02

Fabrication

Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.

Phase 03

Surface protection

Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.

Phase 04

Assembly

Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.

“

A similar project?

Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.