
For the palm oil plant in Westzaan, we fabricated and assembled more than 2,000 tonnes of steel. We also delivered various floor structures, including gratings, chequer plates, ComFlor floors and hollow-core slab floors.
Here we fabricate and assemble more than 2,000 tonnes of steel. We also supply and install a considerable area of gratings, chequer plate, ComFlor floors and hollow-core slabs.
Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.
Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.
Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.
Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.
Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.