Palm Oil Plant Westzaan Bunge
Industrie
2025
NDA
Westzaan

Palm Oil Plant Westzaan Bunge

NDA
Palm Oil Plant Westzaan Bunge
Location
Westzaan
Tonnage
2,000
Type
Industrie
Completion
2025
About this project

The project in detail.

For the palm oil plant in Westzaan, we fabricated and assembled more than 2,000 tonnes of steel. We also delivered various floor structures, including gratings, chequer plates, ComFlor floors and hollow-core slab floors.

Our scope

What we delivered

Here we fabricate and assemble more than 2,000 tonnes of steel. We also supply and install a considerable area of gratings, chequer plate, ComFlor floors and hollow-core slabs.

‍

Approach

From engineering to assembly on site.

Phase 01

Engineering

Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.

Phase 02

Fabrication

Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.

Phase 03

Surface protection

Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.

Phase 04

Assembly

Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.

“