2023-2026
Wijnen Bouwgroep
Bleiswijk

DC Bleiswijk

Wijnen Bouwgroep
DC Bleiswijk
Location
Bleiswijk
Tonnage
2,200
Type
Distributiecentrum
Completion
2023-2026
About this project

The project in detail.

2,200 tonnes of steel for DC Bleiswijk

At the Urban Logistics Campus A12 in Bleiswijk, we are helping to realise three large-scale distribution buildings for Wijnen Bouwgroep:
Building 2-9, building 4 and building 6.

Together, these buildings represent a total area of
approximately 132,500 m².

For this project, we are fabricating and assembling a total of approximately 2,200 tonnes of steel. We are also handling the installation of the hollow-core slab floors.

The combination of large floor areas, high construction speed and a tight logistics schedule demands meticulous preparation and close coordination between fabrication and assembly. Exactly the type of project where our strength in large-scale steel construction comes into its own.

With our steel structures, we are making a key contribution to a substantial, future-proof logistics development in Bleiswijk.

Our scope

What we delivered

‍

  • Three distribution buildings: building 2-9, building 4 and building 6
  • Total area approx. 132,500 m²
  • Approx. 2,200 tonnes of steel
  • Fabrication and assembly of the steel structure
  • Installation of hollow-core slab floors
  • Client: Wijnen Bouwgroep
  • Location: Bleiswijk

‍

Approach

From engineering to assembly on site.

Phase 01

Engineering

Tekla model and shop drawings developed together with the main contractor and the installer. Clash detection up front, so no surprises on the construction site.

Phase 02

Fabrication

Cutting, drilling, welding and blasting in our own hall. MIG/MAG welding throughout.

Phase 03

Surface protection

Blasting to SA 2½ and durable coating in line with corrosivity class C4. Resistant to harsh industrial conditions.

Phase 04

Assembly

Just-in-time delivery by low-loader. Assembly with mobile cranes and our own certified assembly team, VCA**.

“
2,200 tonnes of steel to Bleiswijk

A similar project?

Whether it is a production hall, a distribution centre or a complex industrial project: we work with you from the design stage on steelwork, floors and assembly.